The cement manufacturing process is controlled using ABB''s Advant Controllers and Distribution Control System.
The ABB Advant Systems are reviewed at three levels –the Operational levels, Controller level and Field Level.
The Central Control Room operation desk comprises of four numbers Advant stations for operation interface process. The local control rooms of Limestone crusher, additive Crusher, Packing Plant and Auto lab have one operating station each.
Cement Storage
he Plant is equipped with seven multi flow silos with a total cement storage capacity of 35,000 MTs. The Ordinary Portland Cement (OPC) and Sulphate Resistant Cement (SRC) are stored in these silos. For storing Oil Well Cement a special steel silo of 1500 MTs is available.